15 Lot Unit Development

Following a proposal to create 15 apartments over three new three storey housing buildings in Hutchinson Avenue, Fraser Thomas was engaged to provide Civil, Geotechnical and Surveying services to support the project,  which will span four existing sites.  Our services include:

  • Topographical survey of the site, including both an existing and an abandoned wastewater line
  • Preparation of Scheme Plan
  • Geotechnical investigation and reporting in support of an application for Resource and building consents
  • Civil engineering design of physical upgrade works for:
  1. public stormwater extension
  2. private drainage for the accessway and car park
  3. storm water catchment assessment
  4. private wastewater extension
  5. common accessway and parking
  6. earthworks and sediment control plans
  • Preparation of associated engineering infrastructure report
  • Submission of plans to Auckland Council with Resource Consent application (by others) for approval
  • Make applications for Engineering approval and Building Consent

Expertise provided:

  • Civil
  • Geotechnical
  • Survey

Project cycle:

  • Investigations
  • Preliminary and detailed design
  • Resource/building consenting and engineering approval
  • Construction observation
  • Compliance
  • Land transfer survey