{"id":5435,"date":"2020-11-12T09:21:58","date_gmt":"2020-11-11T20:21:58","guid":{"rendered":"http:\/\/fraserthomas.wpengine.com\/?post_type=projects&p=5435"},"modified":"2024-03-20T16:30:48","modified_gmt":"2024-03-20T03:30:48","slug":"church-development-ashburton","status":"publish","type":"projects","link":"https:\/\/fraserthomas.co.nz\/projects\/church-development-ashburton\/","title":{"rendered":"Church Development, Ashburton"},"content":{"rendered":"\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t\t
\n\t\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t\t
\n\t\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t
\n\t\t\t\t\t\t\t

Church Development, Ashburton<\/h2>\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t
\n\t\t\t\t
\n\t\t\t\t\t\t\t

Fraser Thomas supported the application for Resource Consent for a proposed meeting house (Church) in Ashburton.<\/p>\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t

\n\t\t\t
\n\t\t\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t\t
\n\t\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t
\n\t\t\t\t\t\t\t
Church Development, Ashburton<\/h6>\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t
\n\t\t\t\t
\n\t\t\t\t\t\t\t

Fraser Thomas Ltd prepared an Engineering Report to support resource consent applications to Ashburton District Council and Canterbury Regional Council for a proposed meeting house (Church) in Ashburton.<\/h2>\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t
\n\t\t\t\t
\n\t\t\t\t\t\t\t

The Engineering Report includes on-site stormwater treatment, soakage and detention, on\u2011site wastewater treatment and land disposal, associated carparking and services.<\/p>

Also identified are the infrastructure constraints for the development and presented, with accompanying calculations and drawings, the site and infrastructure works sufficient to support Resource Consent for:<\/p>

  • Earthworks and associated erosion and sediment control measures<\/li>
  • Access and parking<\/li>
  • Water<\/li>
  • Wastewater<\/li>
  • Stormwater\u00a0<\/li><\/ul>

    \u00a0<\/strong><\/p>

    Challenges included:<\/strong><\/p>

    \u00a0<\/strong><\/p>

    • Getting drainage to work on a flat site<\/li>
    • High groundwater table placing constraints on on-site (wastewater disposal and stormwater soakage)<\/li>
    • Inadequate provision by development downstream of site for overland flows from upgradient catchment, including this site.<\/li><\/ul>

      We also prepared evidence and attended a resource consent hearing. All consents have been granted and the Church is progressing to construction.<\/p>\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t

      \n\t\t\t
      \n\t\t\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t
      \n\t\t\t\t\t\t
      \n\t\t\t\t\t
      \n\t\t\t
      \n\t\t\t\t\t\t
      \n\t\t\t\t
      \n\t\t\t\t\t\t\t\t\t\t\t\t\t\"\"\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t
      \n\t\t\t
      \n\t\t\t\t\t\t
      \n\t\t\t\t
      \n\t\t\t\t\t\t\t

      Services Provided:<\/h2>\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t
      \n\t\t\t\t
      \n\t\t\t\t\t\t\t
      • Civil Engineering<\/li>
      • Environmental Engineering<\/li>
      • Geotechnical Engineering<\/li>
      • Surveying<\/li><\/ul>\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t
        \n\t\t\t\t\t\t
        \n\t\t\t\t\t
        \n\t\t\t
        \n\t\t\t\t\t\t
        \n\t\t\t\t
        \n\t\t\t\t\t\t\t

        Gallery\u00a0<\/h2>\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t
        \n\t\t\t\t
        \n\t\t\t\t\t
        \n\t\t\t\n\t\t