{"id":5462,"date":"2020-11-12T14:57:03","date_gmt":"2020-11-12T01:57:03","guid":{"rendered":"http:\/\/fraserthomas.wpengine.com\/?post_type=projects&p=5462"},"modified":"2024-03-20T16:07:28","modified_gmt":"2024-03-20T03:07:28","slug":"sprott-road-housing-development","status":"publish","type":"projects","link":"https:\/\/fraserthomas.co.nz\/projects\/sprott-road-housing-development\/","title":{"rendered":"Sprott Road Housing Development"},"content":{"rendered":"\t\t
Engineering and surveying services were provided to support the subdivision and construction of three new townhouses in Kohimarama.<\/p>\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t
Our services incorporated works involving public drainage upgrade and extension, stormwater detention, shared accessway, extensive retaining wall, pipe bridging and associated cut fill earthworks. Included with the resource consent application were full engineering design plans for the civil works and a geotechnical investigation report. Approval was given to allow the private wastewater pumps for two of the lots\/townhouses.<\/p>
\u00a0<\/p>
FTL involvement included the following stages:<\/p>
\u00a0<\/p>