{"id":716,"date":"2020-11-13T17:03:38","date_gmt":"2020-11-13T04:03:38","guid":{"rendered":"http:\/\/fraserthomas.wpengine.com\/?post_type=projects&p=716"},"modified":"2024-03-20T16:29:24","modified_gmt":"2024-03-20T03:29:24","slug":"colin-dale-park-motorsport-development","status":"publish","type":"projects","link":"https:\/\/fraserthomas.co.nz\/projects\/colin-dale-park-motorsport-development\/","title":{"rendered":"Colin Dale Park \u2013 Motorsport Development"},"content":{"rendered":"\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t\t
\n\t\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t\t
\n\t\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t
\n\t\t\t\t\t\t\t

Colin Dale Park\u00a0
Motorsport Development<\/h2>\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t
\n\t\t\t\t
\n\t\t\t\t\t\t\t

Development of Colin Dale Park as a world class Motorsports Venue in Prices Road, Puhinui.<\/p>\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t

\n\t\t\t
\n\t\t\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t\t
\n\t\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t
\n\t\t\t\t\t\t\t
Colin Dale Park \u2013 Motorsport Development, Puhinui<\/h6>\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t
\n\t\t\t\t
\n\t\t\t\t\t\t\t

Development of Colin Dale Park as a world class Motorsports Venue in Prices Road, Puhinui, to provide for a range of motorsport activities including BMX, radio controlled miniature cars, Motocross,<\/h2>

off-road racing, go-karts and small jet boats.<\/h2>\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t
\n\t\t\t\t
\n\t\t\t\t\t\t\t

Fraser Thomas completed detailed design, consenting, tendering during 2014 which included a major rescoping of the project due to budget cuts. The contract was awarded in January 2015 and we provided the construction observation\/project management for the construction works that commenced in February 2015 for the first stage of works that included 240 car parks. In 2018 we were involved with the preliminary design and scoping for construction of a stadium for a large motorsport entity that was looking to take over a section of the park. These works involved completion of the Auckland Council car parks, earthworks, and stormwater system design. In 2019 Fraser Thomas undertook detailed design for the second stage of car parks, which involved design for an additional 260 car parks. We tendered out the project and provided observation and project management services. Construction of these car parks began in late 2019 and was completed in February 2020. Stage 3 design to finish the remaining 466 car parks was completed in October 2020 for resource consent application.<\/p>\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t

\n\t\t\t
\n\t\t\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t\t
\n\t\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t
\n\t\t\t\t\t\t\t\t\t\t\t\t\t\"\"\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t
\n\t\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t
\n\t\t\t\t\t\t\t

Key Features of Site:<\/h2>\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t
\n\t\t\t\t
\n\t\t\t\t\t\t\t
  • Demolition and removal of the existing house, farm buildings and associated site infrastructure<\/li>
  • Approximately 216,000m\u00b3 of cut-fill earthworks over a 31.4ha area<\/li>
  • Formation of development platforms for each User Group, access roading, carparking, temporary sediment ponds and permanent stormwater wetlands<\/li>
  • Capping of an old landfill located within the development area<\/li>
  • Capping of an existing groundwater bore and provision of a new water supply bore<\/li>
  • On-site wastewater treatment and land disposal<\/li>
  • Treatment and extended detention of stormwater runoff from carparking, access road and user group facilities using a combination of swales, wetlands and the Jet Sprint pond<\/li>
  • Removal of over 80 exotic trees and extensive landscaping, both within the park and along adjacent riparian areas<\/li>
  • Approximately 900 carparks to be used during motorsport events<\/li><\/ul>\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t
    \n\t\t\t\t\t\t
    \n\t\t\t\t\t
    \n\t\t\t
    \n\t\t\t\t\t\t
    \n\t\t\t\t
    \n\t\t\t\t\t\t\t

    Services Provided:<\/h2>\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t
    \n\t\t\t\t
    \n\t\t\t\t\t\t\t
    • Civil Engineering<\/li>
    • Environmental Engineering<\/li>
    • Geotechnical Engineering<\/li>
    • Surveying<\/li>
    • Resource Management<\/li>
    • Contaminated Land<\/li><\/ul>\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t