{"id":729,"date":"2020-11-10T13:46:12","date_gmt":"2020-11-10T00:46:12","guid":{"rendered":"http:\/\/fraserthomas.wpengine.com\/?post_type=projects&p=729"},"modified":"2023-09-28T12:06:00","modified_gmt":"2023-09-27T23:06:00","slug":"enga-hydropower-papua-new-guinea","status":"publish","type":"projects","link":"https:\/\/fraserthomas.co.nz\/projects\/enga-hydropower-papua-new-guinea\/","title":{"rendered":"Enga Hydropower \u2013 Papua New Guinea"},"content":{"rendered":"\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t\t
\n\t\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t\t
\n\t\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t
\n\t\t\t\t\t\t\t

Enga Hydropower\nPapua New Guinea<\/h2>\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t
\n\t\t\t\t
\n\t\t\t\t\t\t\t

Fraser Thomas was engaged to complete a prefeasibility study for Hydro-power in Papua New Guinea, as they face huge challenges in providing electrical power to its substantial and rapidly growing rural population.<\/p>\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t

\n\t\t\t
\n\t\t\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t\t
\n\t\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t
\n\t\t\t\t\t\t\t
Enga Hydropower – Papua New Guinea<\/h6>\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t
\n\t\t\t\t
\n\t\t\t\t\t\t\t

Papua New Guinea, a major exporter of petroleum energy (particularly liquid natural gas, LNG) faces huge challenges in providing electrical power to its substantial and rapidly growing rural population.<\/h2>\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t
\n\t\t\t\t
\n\t\t\t\t\t\t\t

Hydro-power provides a promising option in the country\u2019s extensive mountainous terrain and some small schemes already exist. The Tsak Valley in the remote Enga province has a number of fast flowing rivers and on the joint initiative of the local Member for Parliament and the New Zealand High Commissioner to Papua New Guinea, Fraser Thomas were engaged in early 2013 to do a prefeasibility study.<\/p>


<\/p>\n

<\/p>\n

On the strength of the prefeasibility report, we were subsequently engaged to undertake a feasibility study and teamed up with some of the leading specialists in New Zealand to examine the scope to use leading-edge technology for storage and hybridization with solar power. The study was completed in 2014 and the implementation phase has commenced, with joint New Zealand and Papua New Guinea government financing.<\/p>\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t

\n\t\t\t
\n\t\t\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t\t
\n\t\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t
\n\t\t\t\t\t\t\t\t\t\t\t\t\t\"\"\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t
\n\t\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t
\n\t\t\t\t\t\t\t

Services Provided:<\/h2>\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t
\n\t\t\t\t
\n\t\t\t\t\t\t\t
  • Civil Engineering<\/li>
  • Environmental Engineering<\/li>
  • Geotechnical Engineering<\/li>
  • Surveying<\/li>
  • Resource Management<\/li>
  • International Consulting<\/li><\/ul>\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t
    \n\t\t\t\t\t\t
    \n\t\t\t\t\t
    \n\t\t\t
    \n\t\t\t\t\t\t
    \n\t\t\t\t
    \n\t\t\t\t\t\t\t

    Gallery\u00a0<\/h2>\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t
    \n\t\t\t\t
    \n\t\t\t\t\t
    \n\t\t\t\n\t\t