Te Whāriki Subdivision
This 350-Lot subdivision in Lincoln required numerous challenges to be addressed during the design and construction phases, and offers residents more than just a home.
Fraser Thomas supported the application for Resource Consent for a proposed meeting house (Church) in Ashburton.
The Engineering Report includes on-site stormwater treatment, soakage and detention, on‑site wastewater treatment and land disposal, associated carparking and services.
Also identified are the infrastructure constraints for the development and presented, with accompanying calculations and drawings, the site and infrastructure works sufficient to support Resource Consent for:
Challenges included:
We also prepared evidence and attended a resource consent hearing. All consents have been granted and the Church is progressing to construction.